When to Kill a Project and When Not To

The advice is to see it through. Persistence is a virtue, quitting is a habit, and the difference between the businesses that win and the ones that do not is the willingness to push through the hard middle. It is repeated constantly, it is occasionally true, and it is responsible for an enormous amount of destroyed capacity in ordinary companies, because it supplies a ready-made justification for continuing anything.

Here is the problem with it as operating guidance. Persistence and stubbornness are indistinguishable from the inside while a project is running. They only separate afterward, in hindsight, which means “see it through” is advice you can only evaluate once it is too late to act on. What an operator needs instead is a test that works during, and the test is not about willpower at all. It is about whether the conditions that justified starting are still true.

The test in this article is a portfolio test rather than a project test, and that distinction does most of the work. Asked in isolation, almost any project can mount a defense, because the person defending it knows more about it than anyone in the room. Asked alongside eleven others competing for the same capacity, the weak ones become visible without anyone having to argue that they are bad.

Why Stopping Is Harder Than Starting

Starting a project requires a business case and one approval. Stopping one requires somebody to say a business case that was already approved is now wrong, in front of the people who approved it. Those are not symmetrical asks, and the asymmetry is structural rather than cultural.

Add to that the accounting of sunk cost. Everyone knows intellectually that money already spent should not influence a forward-looking decision. Almost nobody behaves that way in a room, because the spend is not just money, it is somebody’s eighteen months, and asking them to write it off is asking them to accept that the eighteen months produced nothing.

There is a third asymmetry that gets less attention. The person best placed to know a project is failing is the person running it, and they are the one who pays most for saying so. Everybody else is working from a status report written by someone with a strong reason to describe the situation charitably, which is not dishonesty so much as the ordinary human tendency to lead with the part that is going well.

So dead projects do not survive because people are irrational. They survive because stopping has a named cost borne by an identifiable person, and continuing has a diffuse cost borne by nobody in particular. Fix the asymmetry and the behavior changes.

Watch a related video: The One Thing by Gary Keller: Stop Using To-Do Lists.

Watch on YouTube

The Four Kinds of Project Worth Killing

Four distinct situations, with different signatures and different endings. The reason to separate them is that the conversation required to stop each one is completely different, and using the wrong conversation is why so many attempted kills turn into a delay and a review.

The four kinds of project that should be stopped, and the signature of each 1. THE PREMISE CHANGED The reason it started is no longer true Signature: nobody can restate the original business case from memory Ending: fast and blameless 2. IT WORKS, BUT NOT AT THIS COST Delivering, at a price nobody would approve if asked again today Signature: defended on progress, never on return Ending: hardest of the four 3. NOBODY WILL OWN IT Real on paper, unstaffed in practice Signature: the owner changes every reorganization Ending: already dead, needs declaring 4. HELD UP BY ONE REPUTATION Continuing because stopping would embarrass somebody senior Signature: everyone privately agrees, nobody says it in the room Ending: requires cover from above

When the Premise Changed

The cleanest kill available, and the one most often missed. A project was approved because a customer was going to consolidate suppliers, or a regulation was coming, or a competitor had launched something. Then the customer did not consolidate, the regulation was deferred, the competitor withdrew. The reason evaporated and the project continued, because nobody was watching the reason.

The signature is diagnostic and takes thirty seconds to check. Ask three people on the project to state the original business case from memory. If you get three different answers, or a description of what the project does rather than why it exists, the premise has already detached and nobody noticed.

The reason this one gets missed is that nobody is assigned to watch the premise. Projects are governed on delivery, and delivery governance asks whether the thing is being built on time, not whether the thing is still wanted. A project can be perfectly green on every delivery measure for two years after its reason disappeared, and the reporting system has no field in which that fact could appear.

This kill should be fast and it should carry no blame at all, because nobody was wrong. The decision was correct on the information available and the world changed. Say exactly that, publicly, when you stop it. How you handle this one determines whether anybody will ever surface the next one.

When It Works but Not at This Cost

The hardest of the four, because everything about it looks healthy. Milestones are met, the team is competent, the thing being built works. It is simply consuming more capacity than the return justifies, and it would not be approved today if it arrived as a fresh proposal.

That last sentence is the whole test. Ask it literally: if this walked in the door tomorrow, at the remaining cost to complete, with what we now know about the return, would we approve it? Remaining cost, not total. The money already spent is gone under either decision and including it in the comparison is the error.

Ask whether you would approve it today at the remaining cost to complete. The money already spent is gone under either decision, so it belongs in neither column.

The variant to watch for is the project whose scope has quietly expanded to justify the spend. It started as a six-month change and is now a platform. Nobody approved the expansion in one decision; it arrived through a series of reasonable additions, each of which made the original case slightly less relevant. When you cannot find a single approval for the current scope, you are looking at this kind.

Expect the defense to be about progress rather than return, because progress is what the team controls and return usually is not. That is a fair position from the team and an insufficient one for the decision. Progress against plan tells you the project is being run well. It says nothing about whether it should be running.

When Nobody Will Own It

This project is already dead and the organization has not admitted it. It appears on the portfolio list, it has a nominal owner, and the owner has changed three times in two years, each time landing on whoever had the least ability to refuse.

The signature is staffing rather than progress. Look at who is actually spending hours on it this month. If the answer is nobody, or a fraction of one person alongside four other things, the organization has already made its decision through resource allocation and is simply not saying so.

Be careful to distinguish this from a genuinely important project that is under-resourced, which looks identical on a staffing report and requires the opposite response. The difference is whether anyone has asked for more resource and been refused. An important project starved of people generates escalation. A dead one generates silence, and the silence is the diagnostic.

These are the cheapest to stop and the most valuable to clear, because each one occupies a line on the portfolio, a slot in the review, and a small amount of everyone’s attention every month. Clearing six of them in one sitting is a genuine capacity release and it usually meets no resistance at all, since nobody was invested enough to object.

When One Reputation Is Holding It Up

The political case. The project continues because it is associated with somebody senior, and stopping it would be read as a judgment on them. Everyone involved knows this. Nobody says it, and the not saying it is what keeps the thing running for years.

The signature is a conversation pattern rather than a metric. People agree privately and go quiet in the room. Questions get answered with reference to who sponsored it rather than to what it produces. And the project survives review cycles that kill objectively healthier work.

One practical route through it: change what the sponsor is being asked to defend. A conversation about whether their project was a mistake has one available answer. A conversation about where the remaining capacity would produce the most return, run across the whole portfolio with their project as one line among twelve, has several, and it lets the sponsor arrive at the stop as a reallocation they participated in rather than a verdict handed to them.

The only ending that works here requires the sponsor to end it themselves, or to be visibly given cover by someone above them. Anyone else stopping it converts an operating decision into a political defeat, and the organization will read it as such regardless of the reasoning attached. This is why the fourth kind takes longer than the other three combined and why it is worth spending relationship capital on rather than process.

Which Projects Should You Not Kill?

Three categories deserve protection, and naming them is what keeps this from being an argument for restlessness, which is its own failure mode and arguably a more expensive one.

Anything whose value is known to be back-loaded. Capability builds, systems replacements, and market entries frequently look worst in the middle by design, and a business that kills on mid-project pain will never complete anything with a long payback. If the plan predicted this trough and you are in it, that is the plan working.

Anything currently in a trough that the original case anticipated. The distinction from the previous paragraph is subtle and matters: it is not enough that someone now says the pain was expected. Check whether it was written down at approval. Retrospective reinterpretation of a plan is the most common way a failing project buys another two quarters.

A fourth case deserves mention even though it is not really a project: regulatory and safety work, which is not subject to return analysis at all. It gets done because it has to be, and applying portfolio logic to it wastes everyone’s time and occasionally produces a genuinely dangerous outcome. Take it off the list before the review starts rather than defending it during.

And anything where stopping costs more than finishing. Late-stage work with a large fixed component sometimes falls here. Do the arithmetic rather than assuming it, because this argument gets claimed more often than it applies.

How Do You Tell the Difference in Practice?

Four questions, asked of the portfolio rather than of one project, which is the part most organizations get wrong. Reviewing a project in isolation invites a defense of that project. Reviewing all of them together forces comparison, and comparison is where the weak ones become visible without anyone having to attack them.

State the original business case from memory. Would we approve the remaining cost today. Who spent hours on this in the last month. And what would we do with those resources instead. That fourth question is the one that changes the conversation, because it replaces an argument about whether the project is bad with an argument about what else the capacity could do, and the second argument is winnable.

Ask them in that order too. Starting with the fourth question first turns the review into a competition before anyone has established the facts, and people defend rather than describe. Starting with the business case is neutral, feels administrative, and produces the most revealing silence of the four.

Run it quarterly across everything, not annually and not on the projects somebody has already flagged. The flagged ones are rarely the expensive ones.

How Do You Actually End It?

Fast, in writing, with the reasoning stated and the people reassigned the same week. A project that is stopped slowly is not stopped. It enters a wind-down that consumes months of the capacity you were trying to recover.

Announce it in one paragraph to everyone who touched it: what is stopping, why, what happens to the work already done, and where each person goes next. The last item is the one people are actually listening for, and leaving it vague for even a few days generates more anxiety and more lost productivity than the stop itself.

Decide what happens to the work already completed before you announce, not after. Code, tooling, supplier agreements, partially built capability. Some of it has value elsewhere and some of it needs unwinding at a cost, and leaving that question open turns a clean stop into a two-month conversation that keeps the project nominally alive while its status is resolved.

Set a hard date, usually within two weeks, after which no further work happens. Without a date, the project decays rather than ends, and decaying projects have a habit of being revived by whoever was most invested in them once attention moves elsewhere.

Tell the people outside the project too. Customers who were told something was coming, suppliers who geared up, adjacent teams who built plans around a delivery date. Internal stops that are not communicated outward reappear months later as a broken commitment nobody remembers making, and the cost of that is usually larger than anything the project itself was consuming.

And say the number. What the stop releases, in hours or dollars, redirected to what. A kill framed as a loss reads as a failure. The same kill framed as a reallocation reads as management, and the difference is entirely in whether you named where the capacity went.

Finally, hold the stop for at least one review cycle before revisiting it. A decision that gets reopened at the next meeting because somebody had second thoughts is worse than no decision, since it teaches everyone that stops are provisional and that defending your project for one more month is a winning strategy.

What to Do With the People

Move them somewhere visible and somewhere good, quickly. How the team of a killed project is treated is watched closely by everyone else, and it sets the price of honesty for the next two years.

If the people on a stopped project are quietly disadvantaged, reassigned to whatever needs filling, or left in limbo for a month, the organization learns that being on a project that gets stopped is career damage. The rational response to that lesson is to defend your project past the point of sense, which is precisely the behavior you were trying to eliminate.

How you treat the team of a killed project sets the price of honesty for the next two years. Everyone is watching, including the people running the next weak project.

The strongest version of this is to give one person from the stopped project a visibly good next assignment within a week, and to say out loud why. It costs nothing, it is the fastest available signal, and it is remembered far longer than any statement about the organization’s attitude to failure.

Be explicit that stopping was a portfolio decision rather than a performance judgment, where that is true. Where it is not true, handle the performance issue separately and later, because bundling the two teaches everyone that a stop is a verdict on the team.

How Do You Stop It Coming Back?

Write down why it stopped and what would have to be true to restart it. Two lines in the portfolio record. Without them, the project returns in eighteen months as a fresh proposal from someone who was not there, and it returns with the original business case intact because nobody recorded what was wrong with it.

Be specific in that line. “If the market changes” restarts nothing and blocks nothing. “If a customer commits volume above X, or if the regulation is confirmed for a date inside eighteen months” is a condition somebody can actually check, and checking it is a two-minute job at a portfolio review rather than a fresh debate.

The restart condition is the more useful of the two lines. It converts a stop from a permanent verdict into a conditional one, which makes the stop easier to accept in the moment and easier to reverse legitimately if the world changes back. It also means the next proposal has to clear a stated bar rather than start from zero.

Record what was learned as well, in two more lines, and keep it short enough that someone will actually read it. Long post-mortems are written to demonstrate rigor and are consulted by nobody. Four lines about why a project stopped and what would restart it will be read by the next person who proposes something similar, which is the only audience that matters.

Keep the record where the next portfolio review will see it. A decision log nobody consults is the same as no decision log, and the discipline that makes this work is the same one that makes any decision stick: it belongs to the operating cadence rather than to anyone’s memory. The related question of how long these calls take to make in the first place is covered in what a slow decision actually costs.

One limitation worth naming: everything above assumes you can see the portfolio. In organizations where projects are funded inside departmental budgets rather than centrally, half the work in progress is invisible to anyone who could compare it, and no amount of review discipline reaches it. Fixing that is a budgeting change, not a project management one, and it is a considerably harder fight than any individual kill.

About the Stagnation Assassin

Todd Hagopian is a Fortune 500 transformation executive who has generated $3B+ shareholder value across five turnarounds at Berkshire Hathaway, Illinois Tool Works, and Whirlpool. He is VP of Product Strategy and Marketing. Known as The Stagnation Assassin, he is the author of two published books: The Unfair Advantage: Weaponizing the Hypomanic Toolbox and Stagnation Assassin: The Anti-Consultant Manifesto. His blog is published in 15+ languages and read by operators worldwide. Bring him to your stage via his speaking page or connect with him on LinkedIn. His newest book is 10-Minute Transformation (February 23, 2027).

Decision Velocity Audit. Send me your current project list with the remaining cost to complete and who spent hours on each one last month. I will tell you which ones are already dead and which of the four kinds you are looking at. Free, and there is no pitch at the end of it. Request the audit here.

Want the short version you can use this week? Pick your problem and get the matching free minibook.

Find my free minibook

The full diagnostic and 90-day playbook: 10-Minute Transformation, February 23, 2027.

Preorder 10-Minute Transformation

Not what you needed? Find Your Solution →