Zero for Three

← The Unaccredited MBA: all issues

This issue first appeared in The Unaccredited MBA, my LinkedIn newsletter, on October 20, 2026.

My wife told me the refrigerator needed to be replaced. I was traveling, so I did what any efficient executive does. I ordered one from my phone.

It didn’t fit.

So I ordered another one. Also from the road. Also without measuring.

It didn’t fit either.

For the third attempt, I got serious. I got out a tape measure. I measured the space. I wrote it down. I ordered the refrigerator.

It didn’t fit. I had measured wrong.

Here’s the part that makes this painful. I spent three years developing and building refrigerators in a refrigeration division. Clearances, door swing, cutout dimensions: that was the job. I have sat in meetings about the exact number of inches a refrigerator needs to breathe.

Andrea could not believe it. Honestly, neither could I.

The old refrigerator is still in our kitchen. It works. My wife no longer discusses replacing it, which is how you know a customer has stopped believing the team can execute.

And then there’s the real problem. When I finally looked at why nothing fit, I found the previous owners had built a custom cutout around one specific model. That model is discontinued. So every new refrigerator is the wrong shape for the hole.

Translation: to buy a $1,500 refrigerator, I need a $2,000 remodel.

Here’s what that taught me.

Every company I’ve ever walked into has a hole in the wall shaped like a discontinued refrigerator.

It’s the ERP system configured around a product line you killed in 2015. It’s the plant layout built for a volume you haven’t run in a decade. It’s the approval process designed for an org chart that’s been reorganized four times. Somebody built it perfectly for the thing they had. Then the thing went away and the hole stayed.

In 10-Minute Transformation I describe a reference frame as “a fence somebody built when the herd was smaller.” The cutout in my kitchen is that fence, in drywall.

Three lessons, all of which I paid for in return shipping.

First, the price of change is never the price of the new thing. It’s the price of the new thing plus the remodel. Leaders budget for the refrigerator and get ambushed by the cabinetry. If your business case for a new system doesn’t include ripping out what the old one was bolted into, it isn’t a business case. It’s a wish.

Second, expertise does not protect you from skipping the basics. It makes skipping them more likely. A rookie would have measured twice because he was scared. I didn’t measure at all because I was confident. The most dangerous people in your building are the ones who’ve done it so many times they’ve stopped checking.

Third, watch your customer’s face. Andrea didn’t get angry after attempt three. She got quiet. That’s worse. When a customer stops asking you to fix the problem, she hasn’t forgiven you. She’s stopped trusting you to do it. That’s the moment the relationship starts to stagnate, and most teams read the silence as peace.

Here’s your homework this week. Find one system, process, or layout in your business that only makes sense because of something you no longer have. Then price the remodel, not just the replacement. That number is the real cost of your stagnation. It’s also probably smaller than the cost of keeping it another five years.

Three years building refrigerators. Zero for three buying one.


More on finding the fences in your own business is in the book: See the book

Bring Todd Hagopian to speak to your team · All issues of The Unaccredited MBA